Advertising:
Own section in the implementation guide (SPRO): Difference between revisions
From SAP Knowledge Base
(Created page with "= Step 1: Create IMG structure = The first step is to create your own IMG structure with a node using transaction code SIMGH. Additional nodes can then be created at the same or lower level: center|alt=create new SPRO section step 1 create IMG structure = Step 2: Create and assign IMG activity = Once the structure is in place, the respective IMG activities nodes can be inserted. As with nodes at the same or lower level: # An...") |
(No difference)
|
Revision as of 13:19, 26 December 2024
Step 1: Create IMG structure
The first step is to create your own IMG structure with a node using transaction code SIMGH. Additional nodes can then be created at the same or lower level:

Step 2: Create and assign IMG activity
Once the structure is in place, the respective IMG activities nodes can be inserted. As with nodes at the same or lower level:

